Fire and storm damage demolition
A structure damaged by fire, high winds, or flooding often has to come down under different conditions than a planned demolition. The building may be structurally unstable, subject to a municipal unsafe-building order, and tied up in an active insurance claim, all at once.
- Structural risk: fire-weakened framing, storm-collapsed roofs or waterlogged walls can shift or fail during teardown, so crews working these jobs are used to shoring and stabilizing before demolition begins.
- Insurance coordination: photos, debris sorting and documentation are often needed to support a homeowner or property owner's claim, so it helps to work with a contractor who has done this before.
- Municipal orders: a building deemed unsafe after fire or storm damage may come with a deadline from the city to demolish or secure it, which adds urgency beyond a typical emergency call.
Older buildings damaged by fire may also need hazardous material testing before demolition, since fire and water damage can disturb asbestos or other materials that were previously contained.
What it costs
Cost depends on the extent of the damage, whether hazardous materials (like asbestos in an older fire-damaged building) need testing or abatement first, how much documentation the insurance claim requires, and how urgently the municipality's unsafe-building order needs to be met.
Top 3 by our score
Ranked from our published scoring of public Google reviews for 24/7 emergency demolition.
- 1. We-Haul Disposal and Demolition Services Inc945.0★ · 235 reviews
- 2. QuickJunkPro945.0★ · 302 reviews
- 3. Superhuman Demolition Inc.925.0★ · 123 reviews
FAQ
- Will insurance cover fire or storm damage demolition?
- Coverage depends on the policy, but many contractors who handle this type of work are experienced at documenting the job (photos, debris logs) to support an insurance claim.
- How fast can a crew respond after fire or storm damage?
- Response time depends on the contractor and the urgency of the situation, especially if the municipality has issued an unsafe-building order with a deadline.
- Does an older fire-damaged building need asbestos testing first?
- Buildings built before the early 1990s often need hazardous material testing before demolition, since fire and water damage can disturb materials like asbestos insulation or siding.
- Who deals with the municipality if the building has an unsafe order on it?
- Contractors who regularly handle damage-related demolition are typically familiar with the local process for unsafe-building orders and can help coordinate the required steps.